RTU32 and RTU32B
UPDM is a remote-monitoring system based on protocol 60870-5-104 made in compliance with Terna specifications.
It protects and keeps the national electricity grid balanced. For this reason, it collects measurements and auxiliary information and activates switch and interruption/modulation commands of loads/producers.
The installation implies moderate plant work, but the configuration must be necessarily carried out by qualified personnel in cooperation with Terna so as to guarantee the correct insertion into the Italian National Electricity System.
The devices made with products with the quality required for the needs of industrial plants.
The whole is housed in an electric cabinet.

IEC 62351-3 and 62351-5 were tested with the DNV GL tools UniGrid Telecontrol Simulator and UniGrid Telecontrol 104 Analyser.